Buyer guide

SKD project readiness

A gate-based readiness review for localization projects before tooling, packing and production promises.

Commercial gate

Validate realistic volume, model stability, local value objectives, duty treatment and funding. A plant plan cannot rescue a weak volume case.

Technical gate

Define assembly depth, bill-of-material split, local parts, process sequence, tooling, utilities, takt assumptions and end-of-line tests.

Operational gate

Review facility, material flow, workforce, training, quality records, traceability, nonconformance control and engineering change management.

Launch gate

Pilot vehicles should prove process and documentation before volume ramp. Final timing follows the verified gaps, supplier plan and authority pathway.